Published On: Sat, Oct 19th, 2019

Second N-plant at TN’s Kudankulam stops operation

Chennai: The second 1,000 MW nuclear power unit at Kudankulam, owned by the Nuclear Power Corporation of India Ltd (NPCIL) stopped power generation on Saturday, said Power System Operation Corporation Ltd (POSOCO).

The expected date of the unit’s revival is not known

The atomic power plant stopped generation about 12.30 am on Saturday owing to “SG level low”, the company added.

The expected date of the unit’s revival is not known.

The NPCIL has two 1,000 MW nuclear power plants at Kudankulam Nuclear Power Project (KNPP) built with Russian equipment.

Leave a comment

XHTML: You can use these html tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>